Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpvivid-backuprestore domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Ipswich Motorway Upgrade Project (Origin Alliance), Qld | UDEC

Details:

($2 billion, upgrade of 8km of constrained urban motorway from four to six lanes)

  • Coordination, integration, implementation and delivery of the design including Target Outturn Cost (TOC) and detailed design phase.
  • Lead Civil Design for public utility infrastructure for PUP relocation works including water, sewer, gas, Energex, Telstra, and other telcos.

Key Roles – UDEC Personnel

Highways Design Manager – Coordinator for all disciplines
Design Technical Manager – Utilities.
Design Team Manager – Water / wastewater
Senior Project Engineer / Utility Coordinator – Utilities (Construction Team)