Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpvivid-backuprestore domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Pimpama Coomera Waterfuture - Package D, Qld | UDEC

Details:

($80M Water, sewerage, recycled water infrastructure project)

  • Water, sewerage, recycled water infrastructure project)
  • Environmental, Approvals, & Land Tenure Team Leader
  • Lead Civil Design for trunk infrastructure including:
    -1200mm dia. x 800m long trunk gravity sewer main ($10M)
    -90kW recycled water booster pump station ($2M)
    -1600mm dia x 1900m long trunk gravity sewer main ($15M)
    -Various potable & recycled water trunk mains

Key Roles – UDEC Personnel:

Environmental, Approvals, & Land Tenure Team Leader
Lead Design Engineer – trunk infrastructure
Lead Designer / 12d